Memo about inline skates, bicycle, programing, study of japanese ancient music, ancient music of chinese tang dynasty
8 Nov 2014
7 Nov 2014
6 Nov 2014
4 Nov 2014
Connecting parts
At first, I did some small jobs.

This is pillar for steering.

Then there was covered.

Then I welded dropouts to rear fork.

My welding becomes better,I think.

Rear wheel was attached.

Then front and rear parts were connected.

I put seat on it.

It's too wide.

The width was shorten by cutting and welding.

Is it look better ?


This is pillar for steering.

Then there was covered.

Then I welded dropouts to rear fork.

My welding becomes better,I think.

Rear wheel was attached.

Then front and rear parts were connected.

I put seat on it.

It's too wide.

The width was shorten by cutting and welding.

Is it look better ?

3 Nov 2014
30 Oct 2014
Making jig for welding front part
I have never used jig to make python. But this time,I need it.

That's simple construction. Rectangular pipe has screw and angle of 90 degrees.



Then set front parts on it.



After taking, I took off the jig and welding. I should not do it.


My welding becomes better.

I set the front part to the jig. Then I noticed it lost balance.

The center of folk and BB isn't much and a edge of the BB was high than the other one.
I thought about solution. At last, I cut the narrower pipes then with cramping BB and front fork, I welded them again.

Next task was welding pipe for front deraileur on the BB.

Around here, my welding didn't work well.

I welded two pipes between the front fork and the pipe for front deraileur.

This is front part. To check the position of handle, I need welding rear dropouts and making seat.

That's simple construction. Rectangular pipe has screw and angle of 90 degrees.



Then set front parts on it.



After taking, I took off the jig and welding. I should not do it.


My welding becomes better.

I set the front part to the jig. Then I noticed it lost balance.

The center of folk and BB isn't much and a edge of the BB was high than the other one.
I thought about solution. At last, I cut the narrower pipes then with cramping BB and front fork, I welded them again.

Next task was welding pipe for front deraileur on the BB.

Around here, my welding didn't work well.

I welded two pipes between the front fork and the pipe for front deraileur.

This is front part. To check the position of handle, I need welding rear dropouts and making seat.
29 Oct 2014
Subscribe to:
Posts (Atom)